Solar Montana

Archie Bray Solar Project

Location
Archie Bray
Installed
Summer 2017
Power
24.36 kW
Panels
REC 290 TP2
Inverter
(2) Solar Edge 10kW
Mount
Snap N Rack Series 100
Warranty
25 Year Power Production

Solar Montana designed this system in collaboration with Mosaic Architecture for the Archie Bray Foundation for the Ceramic Arts.

Installation took place in July of 2017, and the system was put into production in November 2017.  To see real time production follow this HERE